Project Description
The Bioxide chemical injection station is located at 8688 NW Beaver Drive. Bioxide is used to control odors and corrosion in the sanitary sewer system. To protect the chemical injection equipment a structure is being built to enclose the sewer injection equipment.
Project Bid
$149,998.00
Start Date
July 28, 2020
Project Status
construction
Estimated completion Date
October 2, 2020
Contractor
OLP Construction, LLC
Engineer
Short Elliot Hendrickson, Inc.
Mike Danburg, P.E.
515-608-6000
City Staff Contact
Shane Kinsey
Water/Wastewater Analyst
515-278-0822