Skip to main content
Current Threat Level:
Browse by Category:
Search Projects:
Beaver Drive Trail Study Dept: Parks & Recreation Projected Start Date: 08/17/2010 Projected Completion Date: 10/18/2010 As part of the Johnston's trail system, a trail is being proposed along Beaver Drive from Eagle Crest Drive to 66th Ave.