Green Meadows West Central Channel Stabilization Project

Project Name:  Green Meadows West Central Channel Stabilization Project

Project Map: Click here

Estimated Cost: $2,400,000 (engineering and construction)

Estimated Start Date:

Tree Survey, Topography Survey, Soil Borings – October 20, 2016 lasting approximately 8 weeks - Read this letter to neighbors

Design Engineering – December 2016 – Spring 2017

Construction – 2017 to 2018 to be determined during design process

Contractor:  TBD

Engineer:

Kyle Riley, P.E., CFM

HR Green

5525 Merle Hay Road, Suite 200

Johnston, IA 50131

Email

515-278-2913

City Staff Project Contact:

David Wilwerding, AICP

Johnston Community Development Director

Dave's E-mail

(515) 727-7775

Project Description:  This drainage channel is located on outlots owned by the Green Meadows West Homeowners Association, and runs between Hadfield Circle and Heather Bow west of Foxboro Road and Heather Bow and Tiburon Circle east of Foxboro Road.  The purpose of the project would be to correct erosion and to stabilize the stream banks from the outlet of the storm sewer project completed in 2010 easterly to Beaver Creek. 

Project Funding:  The Green Meadows West Central Channel Stabilization stormwater improvements are funded by the Johnston Stormwater Utility, which was implemented in July 2012 to create a dedicated funding source for projects that reduce erosion, protect properties and infrastructure from flooding and to improve water quality within the City of Johnston, for more information on the stormwater utility, visit the stormwater projects page