Project Name: NW Beaver Drive Trail Development

IMG_5021 (2).JPG

Project Location Map

Estimated Cost: $2,640,300

Estimated Start Date: Work began in September 2014

Estimated Completion Date:  The entire project is scheduled for completion in June 2017

Contractor: Phase 1:  MPS Engineers

Engineer: Shive-Hattery, Inc.

City Staff Project Contact: Parks Director John Schmitz at 515.727.8091 or John's E-mail

Project Description:               
This project is creating a 10’ wide trail that runs along the east/north side of NW Beaver Drive from the north City limits to NW 66th Avenue.  At NW 66th Avenue, the trail will cross to the south side of the road and connect into a trail link east of Beaver Drive.  This trail link will utilize a newly-constructed Kempton Bridge (Sycamore Access) with a pedestrian crossing to connect to the Neal Smith trail system.

Project Status:  
Two miles of the trail is now complete. Construction will resume in Spring 2017.