Inspection Information

Scheduling


All building inspections need to be scheduled by calling the Building Department at 515-727-7778. In order to allow ample time to plan our schedules we ask that you contact us at least 24 hours prior to desired inspection time.

Please leave a message if we cannot answer immediately, and leave the following information:
  • Project address
  • Type of inspection needed
  • Contact name and phone number
All inspections are scheduled on a first come first served basis between 8:30 a.m. - 3:30 p.m. Monday through Friday only.

Required Inspections


The following is a list of required inspections, this is not a full list and other inspections or documentation may be required at any point at the Building Department's discretion.
  • Perimeter Erosion Controls in Place
  • Footing
  • Foundation
  • Plumbing Under Slab/Service
  • Plumbing Rough-in
  • Electrical Rough-in
  • Framing and Mechanical Rough-in
  • Sidewalk, Driveway Approach and Curb Cuts are scheduled through the Public Works Department (515-278-0822)
  • Final Inspection for Certificate of Occupancy (CO)

Things To Know


Soil tests and other engineering may be required. It is the responsibility of the contractor to find out and have any required reports before footing inspections.

Plumbing Policy


Construction water is now included with the building permit. An angle locking meter valve is still required by the plumber upon rough-in completion. Construction water is not intend to be used for soaking foundations, settling ditches or watering sod. If you have any additional questions or concerns, please contact the Johnston Water Department at 515-727-7772.